• Okkie Putriani, S.T., M.T.
    Okkie Putriani, S.T., M.T.
    Transportation Planner yang Desember 2017 lalu terpilih satu dari 15 peneliti muda dalam Research Dive 5: Transportation yang diselenggarakan oleh PulseLab Jakarta. Salah satu pembicara dan delegasi BeKraf Habibie Festival 2018, Tjolomadu, Solo.
Ideas

Car Parking Evaluation Tugu Yogyakarta Railway Station

2018

PT KAI Daops 6 Yogyakarta (2015) imposed a new parking area from east side of Tugu Railway Station to west side of the station or the area Bong Suwung with area covered 6,714m2 accomodated 170 cars and 450 motorcycles. Nevertheless in reality the parking lot and road were often jammed. The proposed of these research was to evaluate the car parking in Tugu Yogyakarta Railway Station. Using three samples in different days: weekend (Saturday, April 23, 2016), holiday (Thursday, May 5, 2016), and regular day (Tuesday, May 24, 2016). Using in-out survey the occupancy count in the selected parking lot is taken. The maximum accumulation was happen on holidays, and the capacity car parking was unavailable enough. The maximum accumulation was ahppen on the second day of the observation May 5,2016, was 349 units. The maximum parking volume was happen on the second day of observation 519 unit cars, May 5, 2016. The average of parking duration from the observation was 18.8 minutes. The maximum turn over level was happen on May 5th, 2016 with 5,36. It showed the parking passengers were using car parking facilities regularly and it would be chaos in holiday. The maximum parking index was over than 100%. It was 367,37% on the second day of observations. The space parking requirement was 5.235m for 349 unit cars. The parking system had to be maintained not only in entrance-exit gates but also on the pick-up/arrival venue. In these final report were given alternatiove solution.


Komentar
--> -->